Description:

Alpha Engineering completed the design and construction management of the new Hurricane Intermediate School located on 1300 South 700 West in Hurricane. This site is located on 15 acres adjacent to the LDS Church orchards. Design of this facility included assisting the Architect, Naylor Wentworth Lund Architects with layout and design of the building, parking lots, multi-use play field and track. Alpha Engineering provided the civil design plans for the project including hydrology studies, finish grading, drainage and utility design. This project also included the installation of 1,300 lineal feet of 12”, 18”, and 24” reinforced concrete storm drain pipe along 1300 South. Alpha Engineering also assisted the Architect with bidding and construction management for the project.